Residences at Meadow Brook - Affordable Housing Project

The Town of East Bridgewater has received the following documents in connection with the proposed affordable housing development – The Residences at Meadow Brook – proposed for a property near the Whitman town line on the west side of North Bedford Street/Route 18. The project consists of forty duplexes (a total of 80 housing units) on the west end of the property near Winter Street of which 20 will be classified as “affordable” (sold to households with incomes meeting certain standards) and four 40-unit apartment buildings (a total of 160 units of which 40 will be “affordable”) on the east side of the property and on the west side of Route 18/North Bedford Street.

The Board of Selectmen is considering whether to enter into a “friendly 40B” agreement with the developer.  In a friendly 40B development, the developer works cooperatively with town boards to minimize density, improve setbacks, or blend architectural aesthetics with the neighborhood.

If the two parties cannot reach agreement on these aspects of the project, the developer has the right to pursue the necessary permits for the project without the support by the Board of Selectmen.

The relevant project documents are as follows:

TABLE OF CONTENTS AND RELATED DOCUMENTS: https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:b2e65221-a363-4330-bebb-c98574c577c9

SITEWORK PLANS LOT D PHASE 1 https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:bb4b698a-73ff-4a00-b2ef-09bd4dc9b42a

DRAINAGE REPORTS: LOT D PHASE 1 https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:fa42f1a9-8e68-4186-b599-d1e4807b3f0a

SITEWORK PLANS LOT B PHASE 2

https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:4e98f42d-f668-4fe9-9043-40a7523bab40


DRAINAGE REPORTS: LOT B PHASE 2 https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:c89daedf-06d0-4de1-95fb-00255c060215

SITEWORK PLANS LOT A PHASE 3 https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:3d878230-6a2d-4c74-82d5-3730b9da0ee5


DRAINAGE REPORTS: LOT A PHASE 3

https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:e36eaad4-3134-41f0-8821-e908087786ac

SITEWORK PLANS LOT C PHASE 4 https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:3be9419f-a02c-48cb-938a-b06983d459ca


DRAINAGE REPORTS: LOT C PHASE 4 https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:280afffa-ae19-48ce-b242-d3a564b44a32

BUILDING PLANS: https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:226e037a-225d-44ec-9d05-5315a1c74e38

WETLAND MAP: https://acrobat.adobe.com/link/track?uri=urn:aaid:scds:US:08fe8ca9-0be8-48bf-96e2-04ce5f3980b4

The Board of Selectmen welcomes comments and questions (e-mail cseelig@eastbridgewaterma.gov) about the project from residents and other interested parties.